4.0.0.160

vPlanner.Manage

New Features
 

  • New "Manage vPlanner.Pull Data" Wizard Dialog (see details in the appropriate help section here: Manage Pull Plan Data
     
  • Resource View Improvements:
  • Added new column options including: Department, Space, Device, Package, and Member.  Those new columns can be used in groups as well.
     
  • Manage Links:
  • A new menu has been added to enable the selection of tasks connected by Suspended links.
 
  • Resources Report
  • The export to Excel now recognizes numeric values instead of exporting them as text fields to excel.
          
  • Import Manager Improvements:
  • You can now save the mappings.  vPlanner will associate the mappings with the file name used for the import.  Using the same file name in the future, will result in the same mappings being applied.  Click the Remember Mappings to save them.
  • Added options to map Spaces, Member names, and Devices.  Note the Member mapping is based on the username in vPlanner.  You have to either map by Company or by Member but not both.
 
  • The Verify Plan tool will not detect out of sequence work in addition to logic loops.
     
  • Production Tracker: 
  • You can now batch delete multiple tasks in production tracker.
  • Performance has been improved when editing cells.
 
  • Login Screen
  • When a user forgets to type a site name, they will get a reminder.
 
  • Locations Dialog attribute labels will now match those of the order in the Filter dialog.
     
  • Export to P6 will now produce an XLSX file with tabs for the Tasks and the Constraints instead of two CSV files.
     
  • Support for importing from Schedule Planner has been discontinued.
 

Fixes:

  • You can now assign a Start Date to a Not-Complete task.
  • The lookahead dialog will now follow the Main Window when working on multiple monitors.
  • The selected tasks count will resent when switching projects.
  • vPlanner will no longer display an alert about batch editing when clearing a multiple selection by pressing the ESC key.
  • Gantt Report no longer wipe out Company and Resource names when applying a re-group.
  • Users dialog will no-longer display View for Site level users (was harmless but it is now more consistent).
  • The Auto-Swimlanes button will now work as expected in the Daily Planning Board.
  • When importing resources via XML and the value is NULL.  An error will not occur anymore.
  • Fixed. Sometimes, not all commitments will be included in the Review Commitments dialog. 
  • Fixed the issue with the Sequence attribute where the value was limited to a maximum of 100.